top of page
Clifton Suspension Bridge
Client: Clifton Suspension Bridge Trust
Year: May - July 2018
Brunels iconic bridge dominates west Bristol and for Paintel Ltd it was an honour to be awarded the contract to prepare and paint the longitudinal girders.
The girders run the length of the 412m long bridge and once prepared Paintel applied a high build zinc primer and two coats of polyurethane.
1/8
bottom of page