top of page

Tamar Anchorage Chambers
Deep in the depths of the Tamar Bridge the suspension cable are anchored either side of the river, in Devon and Cornwall.
As moisture finds a way into the humidity controlled chambers over time corrosion occurs. Paintel Ltd used their team of IRATA trained operatives to apply a coating specifically designed for suspension cables.
Where the cables are bolted into concrete an aluminium bituminous coating was used to help identify corrosion in future inspections.
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Client: Tamar Bridge Torpoint Ferry Joint Committee Year: 2016-2017
bottom of page