top of page

Tamar Stanchions

Due to mechanical damage from a previous projects the Tamar Bridge’s suspension cable stanchions were in need of maintenance.

 

Paintel Ltd prepared the steel to an St3 standard while working at height using hand tools and abrasive paper.

 

The coating system included an elastomeric paint which flexes with the movement of the bridge. 

Hand Strand
Cable Walk

Client: Tamar Bridge Torpoint Ferry Joint Committee Year: 2017

bottom of page