top of page
Tamar Bridge 1961 Sign
Client: Tamar Bridge Torpoint Ferry Joint Committee
Year: 2016 - Present
Paintel were recently asked to inspect the numbers and letters 40 meters up the Tamar Towers. Access was over two seperate nights, one using a Mewp (mobile elevated work platform) and the other was with a team of Irata trained individuals.
​
Although there was a fresh cold wind, everything went well and the numbers and letters are safe and secure




1/6
bottom of page